Specifications
Enquire
| Options | Green Green |
|---|---|
| Description | Description Full length post makes adjustments possible for all cantilever systems. The extended pad length and off centre post design provides even wear for longer life A water groove is located below the mounting post for optimal water dispersion. The angled plow tip is featured for rain and mud removal. This also provides correct toe in during installation Green compound for ceramic rims |
As with any product, specification is subject to change without prior notification. You are advised to confirm current specification before buying.









